0009960 – Eisenhower Pkwy & Knoxville Rd.
This project proposes to convert the intersection of US 80/SR 22/Eisenhower Parkway at CR 715/Knoxville Road from a two way stop controlled condition to a four-leg single lane roundabout.
Priority
14
Reflected in GDOT Schedule
Yes
Total Budget
To Be Determined
Range
Long Range
Additional Details
Project Map
Map content is provided by https://www.dot.ga.gov/.