I-75 from Bass Rd. to Riverside Dr./US Hwy 87
I-75 Corridor: Between Bass Road to Riverside Drive (as a result of failing 2040 LOS)
Priority
41
Reflected in GDOT Schedule
Yes
Total Budget
$6,200,000
Schedule Status
Not scheduled
Range
Long Range
Additional Details
Additional details currently not available. Project not yet on GDOT schedule.