MACONMPO

MATS Project List

Year of the Plan | Transportation

Browse current and planned projects. Use the filters to narrow your results.

Filter Projects
$
$
Reset

I-75 from Mercer Univ. Dr/GA 74 to Eisenhower Pkwy/US Hwy 80

I-75 Corridor: Mercer University Drive to Eisenhower Parkway- both directions (as a result of failing 2040 LOS)

  • Budget: $2,600,000
  • Priority: 31
More

0007029 – Bridge @ Columbus Rd & Echeconnee Creek

Columbus Rd (SR 22) – Replace Bridge at Echeconnee Creek

  • Budget: $77,406,141
  • Priority: 32
More

I-75 from Forsyth St. to Mercer Univ. Dr/GA 74

I-75 Corridor: Forsyth Street to Mercer University Drive- Both Directions (as a result of failing 2012 and 2040 LOS)

  • Budget: $10,700,000
  • Priority: 33
More

0006659 – Bridge @ Peake Rd. & Rocky Creek

Peake Rd. bridge replacement – Replace Bridge at Rocky Creek

  • Budget: $1,833,329
  • Priority: 34
More

I-75 @ Forsyth St.

I-75 Corridor: Forsyth Street – Update Northbound off ramp turn lanes (as a result of failing 2012 and 2040 LOS)

  • Budget: $300,000
  • Priority: 35
More

Safety & Ped improvements on Emery Hwy, from Spring St. to Irwinton Rd.

Safety Improvements: Emery Hwy from Spring Street, to Ocmulgee National Monument, down GA State Route 129, over to Jeffersonville Rd/Ocmulgee East Blvd., out to Irwinton Rd (aka State Route 57)

  • Budget: $1,000,000
  • Priority: 36
More

Pierce Ave/GA 247 & Riverside Dr. turn lane improvements

I-75 Corridor: Pierce Avenue at intersection with Riverside Drive (as a result of failing 2012 and 2040 LOS)

  • Budget: $600,000
  • Priority: 37
More

333150- – Bridge @ Emery Hwy & Walnut Creek

Emery Hwy – Reconstruct Bridge at Walnut Creek

  • Budget: $5,902,371
  • Priority: 38
More

I-75 from Arkwright Rd. to Riverside Dr.

I-75 Corridor: Riverside Drive to Arkwright Road- both directions (as a result of failing 2040 LOS)

  • Budget: $6,800,000
  • Priority: 39
More

Safety & Ped improvements on Eisenhower Pkwy, from Bloomfield Rd. to C St.

Safety Improvements Eisenhower Parkway from Bloomfield Dr to C Street

  • Budget: $1,000,000
  • Priority: 40
More
The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.