Browse current and planned projects. Use the filters to narrow your results.
I-75 Corridor: Between Bass Road to Riverside Drive (as a result of failing 2040 LOS)
Pierce Ave. (aka State Route 247) – Pedestrian improvements and bike lanes from Vineville Ave. to Riverside Dr.
I-75 Corridor: Pio Nono Avenue Northbound ramp intersection
Safety Improvements Gray Hwy from I-75 to Jones County Line
I-75 Corridor: Eisenhower Parkway- Northbound Ramp Intersection (as a result of failing 2040 LOS)
Widen Jeffersonville Road from 2 to 4 thru lanes with a continuous left turn lane from Recreation Rd. to Emery Rd (US 80).
I-75 Corridor: Mercer University Drive- Northbound and Southbound Ramp Intersections (as a result of failing 2012 and 2040 LOS)
I-75/Riverside Drive Interchange – Signalize interchange. Modify ramps to add turn lanes & vehicle cueing at on-ramp. Run fiberoptic cable.
I-75/Riverside Drive Interchange – Signalize interchange. Modify ramps to add turn lanes & vehicle cueing at on-ramp. Run fiberoptic cable.
I-16 Eastbound from I-75 to Walnut Creek-Phase IV